BIM MATURITY LEVEL
In recent years, the construction industry has been transformed by Building Information Modeling (BIM), which is an innovative technology. Throughout the entire building lifecycle, all stakeholders can access and manage project information thanks to BIM, which is a digital representation of a building's physical and functional characteristics. The construction industry operates in a more efficient, cost-effective, and higher quality manner due to the revolutionizing impact of BIM on construction projects. The BIM Maturity Model was developed to evaluate the extent of BIM usage and integration in a project. As follows, the BIM Maturity Model is a framework that recognizes five levels of BIM maturity: Level 0 - Unmanaged CAD: At this level, the project team uses 2D CAD to create drawings without any collaboration. There is no centralized repository of information, and the data is neither standardized nor structured. Level 1 – Managed